Shop OBEX P1 Docs P2 Docs Learn Events
The Groundhog test — Parallax Forums

The Groundhog test

Spiral_72Spiral_72 Posts: 791
edited 2011-12-05 16:08 in General Discussion
The one test every embedded system must pass is the dreaded ground hog test. To perform this test, take your first prototype unit into the lab and connect it to a de-energized power supply. Then stand back, look the other direction and throw the switch. If you see your shadow, there will be 6 more weeks of development.

Comments

Sign In or Register to comment.